Toggle navigation
Menu
SYSTEMS
Electrical
Hydrostatic
Deck
Mechanical
Brake
Suspension
OPERATION
Principle of Operation
Controls
Wire Harness
Adjustments
SERVICE
Torque Specifications
Maintenance Chart
Assembly
PDI Checklist
General
Wheels
ROPS
Caster Forks
Mechanical
Mechanical Neutral
Dampers
Adjust Tracking
Brake System
Brake Adjustment
Brake System Components
Hydrostatic Drive
Transaxle Removal
Transaxle Teardown
Hydraulic Neutral
Oil Change
Purge Procedure
Bypass
Belt Replacement
Service Manuals
Suspension Pod
Removal/Install
Disassembly
Electrical
Wire Harness
GDI Meter
Fuse Block
Grounds
Battery
EFI Adaptor
Continuity Diagram
Engine
Oil Change
KEI Diag Tool
Kawasaki Contact
Deck/CBT System
Deck Removal
Spindles
PTO Belt
Blade Balancing
Deck Leveling
Fuel System
Gas Tank
Fuel Sensor
Fuel Pickup Line
Clutch
Removal/Install
Air Gap Adjustment
DIAGNOSTICS
Wire Schematic
EFI Connector
Electrical
Clutch
Deck
Hydrostatic
ACCESSORIES
3-Bin Bagger
Dump Bagger
Mulching Kit
Hitch Kit
LED Headlight Kit
Operator Controlled Baffle
Lawn Striping Kit
Rear Tweels
Maintenance Kit
MODELS
Solidworks Player Download
Pro-Turn 652 Model
ABOUT
Warranty
Technical Training
Sales Training
RapidCare
Assembly Line
SUPPORT
1
Announcements
- NEW
Technical Service
Customer Assistance
Service / Hydrostatic Drive / Belt Replacement
Belt Replacement
Download
Replace Transaxle Drive Belt
Step 1
Place steering levers in neutral position and engage parking brake.
Step 2
Stop engine, remove key and wait for all moving parts to stop and for hot parts to cool.
Steps 3 - 5
Position mower deck at lowest cutting height.
Remove and retain belt covers.
Lift and rotate access panel rearward until it locks into place. Ensure that footrest release knob is fully engaged.
CAUTION:
CAUTION
Use care when releasing idler spring tension. Keep body parts away from idlers when performing this operation.
Steps 6 - 7
Slowly remove spring hook from anchor bolt to release tension from belt idler.
Remove PTO belt.
Steps 8 - 9
Insert breaker bar or similar tool into square hole of idler arm.
Pull breaker bar counter-clockwise to release tension from belt.
Step 10
Disconnect clutch wire.
Step 11
Remove hardware securing clutch stop bracket to frame and remove bracket.
NOTE
DO NOT cut cable tie.
Step 12
Disconnect spring from anchor bolt.
Step 13
Remove the transaxle drive belt from the system in the following order:
From right transaxle sheave.
From left tranaxle sheave.
From engine sheave.
Step 14
Install the transaxle drive belt to drive system in the following order:
Around left transaxle sheave.
Around engine transaxle sheave.
Around right transaxle sheave.
Steps 15 - 18
Align belt with idler pulley.
Reconnect idler spring hook to anchor bolt.
Insert breaker bar or similar tool into square hole of idler arm.
Pull breaker bar clockwise to increase belt tension.
IMPORTANT
Make sure belt has tension and is aligned in all pulleys.
Step 19
Reinstall clutch stop bracket and secure with original hardware.
Steps 20 - 21
Reinstall clutch wire.
Return seat to operating position.
Steps 22 - 24
Install PTO belt around clutch sheave at rear of unit.
Install PTO belt around top groove of split pulley at deck center and around left spindle pulley.
Align belt with idler pulleys.
Reinstaller idler spring hook around anchor bolt to apply tension to belt.
IMPORTANT
Ensure belts are correctly aligned in pulleys.
Steps 25 - 26
Reinstall belt covers.
Pull footrest release knob to close footrest.
❮
❯